The scope of the work consisted of a continuation to the expansion of St Andrew’s High School with a 7,000 square foot expansion to the north east corner of the building for a new drama and music wing.
Victoria 2020-2022
The scope of the work consisted of a continuation to the expansion of St Andrew’s High School with a 7,000 square foot expansion to the north east corner of the building for a new drama and music wing.
Victoria 2020-2022